The main objective in development of pumping equipment Avangard is strict requirements to its reliability and failure-safe operation. To ensure this, we use materials of high wear resistance: tungsten carbide, high-strength cast iron, modern polymeric materials. 

Our plant is fully equipped for the full production cycle from the foundry, heat treatment, parts manufacture on the axial CNC machines to assembly on the frame.

Andrew V. Shutov
General Director
History in numbers
2012

  • Creation of High-Precision Casting Plant Avangard, LLC

  • Purchasing and installation of direct and indirect equipment

  • Launching of the first electric-arc furnace

  • Manufacturing of cast iron and parts using cold-setting mixtures 


2013

  • Foundry modernization

  • Installation of the first induction furnace

  • Installation of lost foam casting line

  • Refinement of lost foam casting technology

  • Launching of the full cycle of casting

  • Manufacturing of parts and units by means of lost foam casting and using cold-setting mixtures

  • Implementation of steel casting technology


2014

  • Introduction of parts production for oil industry and Russian Railways

  • Implementation of casting technology of high-grade cast iron VCh-40 and VCh-60

  • Purchasing of the machining centers equipment (manufactured in Germany)

  • Launching of the second line of induction furnaces



2015

  • Launching of the machining area

  • Introduction of parts production for automotive industry

  • Launching of the paint line with an oven


2016

  • Introduction of spare parts production for oil industry

  • Opening and launch of the machining and assembly shop

  • Launching of the third induction furnace line

  • Reception of the Certificate of Conformity GOST R ISO 9001-2015

  • Reception of the Certificate of Conformity of the Customs Union

  • Launching of slurry pumps testing line 


2017

  • Introduction of production of electric and hydraulic slurry pumping units

  • Supply complete pumps and units to the oil and gas enterprises for under-control operation 


2018

  • Expansion of the pump equipment range up to six pumps dimension-types

  • Certification ISO 9001:2015


Our specialists
Sergey L. Ivantaev
Development Director
Sergey Y. Kondratenko
Production Director
Aleksey V. Ermakov
Head of Products Testing and Certification Department
Valentin A. Isaev
Chief Metallurgist
Natalia G. Perevozchikova
Chief Accountant
Sign up for the plant tour
3 reasons to sign up for the tour
  1. Getting to know metallurgical production, cycle of assembly
  2. Witnessing bench-tests of pumps units
  3. Evaluation of the quality management system
Leave your contact details
Certificates
Our customers
Have you got any questions?

You can fill out a form for consultation with a leading specialist